Flexible Heuristics for Project Scheduling with Limited Resources

ŠEDA, M.

English title

Flexible Heuristics for Project Scheduling with Limited Resources

Type

Paper in proceedings (conference paper)

Language

en

Original abstract

Resource-constrained project scheduling is an NP-hard optimisation problem. There are many different heuristic strategies how to shift activities in time when resource requirements exceed their available amounts. These strategies are frequently based on priorities of activities. In this paper, we assume that a suitable heuristic has been chosen to decide which activities should be performed immediately and which should be postponed and investigate the resource-constrained project scheduling problem (RCPSP) from the implementation point of view. We propose an efficient routine that, instead of shifting the activities, extends their duration. It makes it possible to break down their duration into active and sleeping subintervals. Then we can apply the classical Critical Path Method that needs only polynomial running time. This algorithm can simply be adapted for multiproject scheduling with limited resources.

Keywords in English

project management, resource-constrained scheduling, NP-hard problem, CPM, heuristic method

Released

2007-10-01

Publisher

WASET

Location

Nice (France)

Book

Proceedings of WASET International Conference on Computer, Electrical and Systems Science and Engineering CESSE 2007

Pages from–to

170–174

Pages count

5

BIBTEX


@inproceedings{BUT23387,
  author="Miloš {Šeda}",
  title="Flexible Heuristics for Project Scheduling with Limited Resources",
  booktitle="Proceedings of WASET International Conference on Computer, Electrical and Systems Science and Engineering CESSE 2007",
  year="2007",
  pages="170--174",
  publisher="WASET",
  address="Nice (France)"
}