Results of Research and Development
Technical report on project progres in 2015: First measurement of check valve C09 (C23)
Publication Year: 2015
HIMR, D.
Technical report on project progress in 2015 - Conditions for stationary flow instability
Publication Year: 2015
POCHYLÝ, F.
Technical report on project progress in 2015 - Modification of the experimental circuit and the preparation for the measurement using electrical impedance tomography and the time-resolved PIV
Publication Year: 2015
RUDOLF, P. ŠTEFAN, D. KOZÁK, J.
Technical report on project progress in 2015 - Optimization method for design of hydraulic machines – adjoint optimization
Publication Year: 2015
RUDOLF, P. MORAVEC, P.
Technical report on project progress in 2015: Test circuit for measurement of check valve dynamic behaviour
Publication Year: 2015
HIMR, D.
Techniques of measuring spray-cooling homogeneity
Publication Year: 2015
CHABIČOVSKÝ, M. RAUDENSKÝ, M.
Test Rig Development for Up-to-Date Experimental Study of Multi-Stage Flash Distillation Process
Publication Year: 2015
VONDRA, M. BOBÁK, P.
Testing of Implant Prototype of Femoral Component Using Hydraulic Machine ZD40
Publication Year: 2015
SEDLÁK, J. SLANÝ, M. FIALA, Z. JAROŠ, A. BLAŽKOVÁ, V.
Testing of mechanical properties of specific rubber under cyclic deformation and creation of a material model
Publication Year: 2015
SKÁCEL, P. BURŠA, J.
The analysis of the material 54SiCr6, associated with the validation of vendor MMK and comparison with existing suppliers
Publication Year: 2015
PÍŠKA, M.
Showed 7711–7725 from 23293 results