Detail publikace
Solving Resource-Constrained Project Scheduling Problem As a Sequence of Multi-Knapsack Problems
ŠEDA, M.
Anglický název
Solving Resource-Constrained Project Scheduling Problem As a Sequence of Multi-Knapsack Problems
Typ
Stať ve sborníku v databázi WoS či Scopus
Jazyk
en
Originální abstrakt
This paper describes a new technique for solving the duration minimization in a resource-constrained network. It is based on a transformation of the resource-constrained project scheduling problem (RCPSP) to a sequence of (multi)knapsack problem (MKP) solutions. In the first part, three deterministic approaches are summarized and their time complexity is discussed. Due to the combinatorial nature of the problem for large projects with many constraints, heuristic techniques are applied. A genetic algorithm approach is proposed and compared with simulated annealing.
Klíčová slova anglicky
Resource-Constrained Project Scheduling Problem, Multi-Knapsack Problem
Vydáno
2006-07-01
Nakladatel
WSEAS
Místo
Athens
ISBN
960-8457-47-5
Kniha
Proceedings of the 10th WSEAS International Conference on Computers
Strany od–do
80–
Počet stran
7
BIBTEX
@inproceedings{BUT20352,
author="Miloš {Šeda}",
title="Solving Resource-Constrained Project Scheduling Problem As a Sequence of Multi-Knapsack Problems",
booktitle="Proceedings of the 10th WSEAS International Conference on Computers",
year="2006",
pages="7",
publisher="WSEAS",
address="Athens",
isbn="960-8457-47-5"
}